

SAG's GDRM-Anlagenbau constructed a natural gas transfer station from the pipeline network of Saar-Ferngas AG for Stadtwerke Trier. The input pressure is 10 - 50 bar, the output pressure 0.6 - 0.9 bar and the measurement pressure 5 bar. The transfer station allows a flow volume of 4000 m3/h.